威尼斯娱人城(3788.v·China认证)精品官网-Just Do it

中文版 | ENGLISH

Shopping mall in Belgium(in Sep 2008)

Time: 2008-06-19 │ Click: 

Processing techniques: cutting, welding, drilling from hot rolled H beam,
Contract date: 9/12/2008.
Steel grade: Q345B.
Length: 300- 11’980mm.
Quantity: 564 pieces.
Total weight: 416 Metric tons.
Production period: 30 days.
Descaling: SA2.5 sand blast treatment
Painting: 80micro 2-PACK Epoxy Zinc Phosphate (Base coating); 
               150micro 2-PACK Epoxy finishing coating (French Grey)

Processing Standard: GB50205-2001