威尼斯娱人城(3788.v·China认证)精品官网-Just Do it

中文版 | ENGLISH

Workshop item of Alcohol mill in Mali(in Aug 2009)

Time: 2009-05-20 │ Click: 

Character of item: such item was built in south of Mali,in the bad circumstance with tancetropical desert climate,we design the simple drawing which is supplied by customer again so that the drawing can be better to meet customer's demand and circumstance's demand.

Area of workshop: 40m*30m, 46m*20m, 30m*20m
Grade of member: Q235B
Total weight: 174.084MT
Delivery date: 50 days
Remove rust: SA2.5 abrasive blasting
Painting: 80 micron epoxy primer(light gray)
Fabricate standard: GB50205-2001
Contract date: 2009.8.11
Price terms: FOB Qingdao port
Main member: column, girder, purline, brace, bolt ect
Attch product: two sets of crane,plastic steel window,aluminium alloy door

Remark: such item is a relatively complete project of steel structure.we design all drawings for customer,we supply all product including a distilling tower,crane with capacity of 10 MT,ALL the window and door except wall and roofing,we also supply quick-wear part and spare part for our customer when the cargo is deliverd,supplying excellent service is our Aspiring for ever.